Supply Date22 Feb 2021
Contract NumberSAFAL/P/MN ORE/01.05/2021
ItemManganese Ore
Supplier NameDebansy Engineering Ltd
Grade (%)High (44% - 50%)
Lot NumberDebansy Engineering Mn Ore
Deviance0
Inward Quantity43.64
Freight0
Loading Charges5
Offloading Charges0
Royalty3.85
Other Cost1
Quality Deviance0
Grade Deviance0
Total Cost2742.77
Conversion Rate (Please insert 1 if no conversion is required)1
Inward StatusAccepted

Raw Material Test

Showing 1-10 of 10 items.
Raw Material ComponentValue
Mn39.7
Fe3.86
SiO211.85
Al2O36.89
P0.165
Size 0-10MM5.18
Size 10-20MM3.79
Size 20-100MM31.33
Size +100MM59.70
MOISTURE2.05