Supply Date22 Feb 2021
Contract NumberSAFAL/P/MN ORE/01.05/2021
ItemManganese Ore
Supplier NameDebansy Engineering Ltd
Grade (%)High (44% - 50%)
Lot NumberDebansy Engineering Mn Ore
Deviance0
Inward Quantity26.17
Freight8.44
Loading Charges-4
Offloading Charges0
Royalty3.85
Other Cost1
Quality Deviance0
Grade Deviance0
Total Cost1630.13
Conversion Rate (Please insert 1 if no conversion is required)1
Inward StatusAccepted

Raw Material Test

Showing 1-10 of 10 items.
Raw Material ComponentValue
Mn38.66
Fe2.72
SiO212.9
Al2O37.37
P0.175
Size 0-10MM3.86
Size 10-20MM4.14
Size 20-100MM42.34
Size +100MM49.66
MOISTURE2.86