Supply Date21 Feb 2021
Contract NumberSAFAL/P/MN ORE/01.05/2021
ItemManganese Ore
Supplier NameDebansy Engineering Ltd
Grade (%)High (44% - 50%)
Lot NumberDebansy Engineering Mn Ore
Deviance0
Inward Quantity35.42
Freight8.44
Loading Charges-4
Offloading Charges0
Royalty3.9
Other Cost1
Quality Deviance0
Grade Deviance0
Total Cost2208.08
Conversion Rate (Please insert 1 if no conversion is required)1
Inward StatusAccepted

Raw Material Test

Showing 1-10 of 10 items.
Raw Material ComponentValue
Mn39.82
Fe2.34
SiO212.77
Al2O36.9
P0.175
Size 0-10MM6.72
Size 10-20MM3.95
Size 20-100MM32.47
Size +100MM56.86
MOISTURE2.55