Supply Date20 Feb 2021
Contract NumberSAFAL/P/MN ORE/01.05/2021
ItemManganese Ore
Supplier NameDebansy Engineering Ltd
Grade (%)High (44% - 50%)
Lot NumberDebansy Engineering Mn Ore
Deviance0
Inward Quantity27.325
Freight8.44
Loading Charges-4
Offloading Charges0
Royalty3.9
Other Cost1
Quality Deviance0
Grade Deviance0
Total Cost1703.44
Conversion Rate (Please insert 1 if no conversion is required)1
Inward StatusAccepted

Raw Material Test

Showing 1-10 of 10 items.
Raw Material ComponentValue
Mn39.79
Fe3.8
SiO211.96
Al2O37.89
P0.17
Size 0-10MM5.98
Size 10-20MM5.17
Size 20-100MM30.45
Size +100MM58.40
MOISTURE2.4