Supply Date20 Feb 2021
Contract NumberSAFAL/P/MN ORE/01.05/2021
ItemManganese Ore
Supplier NameDebansy Engineering Ltd
Grade (%)High (44% - 50%)
Lot NumberDebansy Engineering Mn Ore
Deviance0
Inward Quantity43.48
Freight0
Loading Charges5
Offloading Charges0
Royalty3.9
Other Cost1
Quality Deviance0
Grade Deviance0
Total Cost2734.89
Conversion Rate (Please insert 1 if no conversion is required)1
Inward StatusAccepted

Raw Material Test

Showing 1-10 of 10 items.
Raw Material ComponentValue
Mn40.8
Fe2.7
SiO212.4
Al2O36.88
P0.17
Size 0-10MM7.33
Size 10-20MM5.18
Size 20-100MM40.29
Size +100MM47.2
MOISTURE2.22