Supply Date20 Feb 2021
Contract NumberSAFAL/P/MN ORE/01.05/2021
ItemManganese Ore
Supplier NameDebansy Engineering Ltd
Grade (%)High (44% - 50%)
Lot NumberDebansy Engineering Mn Ore
Deviance0
Inward Quantity47.03
Freight0
Loading Charges5
Offloading Charges0
Royalty3.9
Other Cost1
Quality Deviance0
Grade Deviance0
Total Cost2958.19
Conversion Rate (Please insert 1 if no conversion is required)1
Inward StatusAccepted

Raw Material Test

Showing 1-10 of 10 items.
Raw Material ComponentValue
Mn39.4
Fe2.97
SiO212.35
Al2O37.09
P0.175
Size 0-10MM6.06
Size 10-20MM3.8
Size 20-100MM44.96
Size +100MM45.18
MOISTURE2.18