Supply Date19 Feb 2021
Contract NumberSAFAL/P/MN ORE/01.05/2021
ItemManganese Ore
Supplier NameDebansy Engineering Ltd
Grade (%)High (44% - 50%)
Lot NumberDebansy Engineering Mn Ore
Deviance0
Inward Quantity43.77
Freight5
Loading Charges0
Offloading Charges0
Royalty3.99
Other Cost1
Quality Deviance0
Grade Deviance0
Total Cost2757.07
Conversion Rate (Please insert 1 if no conversion is required)1
Inward StatusAccepted

Raw Material Test

Showing 1-9 of 9 items.
Raw Material ComponentValue
Mn42.06
Fe2.16
SiO212.64
Al2O37.45
P0.175
Size 0-10MM6.45
Size 10-20MM5.08
Size 20-100MM38.65
Size +100MM49.82