Supply Date19 Feb 2021
Contract NumberSAFAL/P/MN ORE/01.05/2021
ItemManganese Ore
Supplier NameDebansy Engineering Ltd
Grade (%)High (44% - 50%)
Lot NumberDebansy Engineering Mn Ore
Deviance0
Inward Quantity24.705
Freight8.44
Loading Charges-4
Offloading Charges0
Royalty3.99
Other Cost1
Quality Deviance0
Grade Deviance0
Total Cost1542.33
Conversion Rate (Please insert 1 if no conversion is required)1
Inward StatusAccepted

Raw Material Test

Showing 1-9 of 9 items.
Raw Material ComponentValue
Mn39.29
Fe4.10
SiO212.08
Al2O37.90
P0.175
Size 0-10MM7.30
Size 10-20MM2.18
Size 20-100MM40.55
Size +100MM49.97