Supply Date19 Feb 2021
Contract NumberSAFAL/P/MN ORE/01.05/2021
ItemManganese Ore
Supplier NameDebansy Engineering Ltd
Grade (%)High (44% - 50%)
Lot NumberDebansy Engineering Mn Ore
Deviance0
Inward Quantity32.805
Freight8.44
Loading Charges-4
Offloading Charges0
Royalty3.99
Other Cost1
Quality Deviance0
Grade Deviance0
Total Cost2048.02
Conversion Rate (Please insert 1 if no conversion is required)1
Inward StatusAccepted

Raw Material Test

Showing 1-9 of 9 items.
Raw Material ComponentValue
Mn40.52
Fe2.46
SiO212.27
Al2O37.30
P0.175
Size 0-10MM5.27
Size 10-20MM6.44
Size 20-100MM27.89
Size +100MM60.40