Supply Date18 Feb 2021
Contract NumberSAFAL/P/MN ORE/01.05/2021
ItemManganese Ore
Supplier NameDebansy Engineering Ltd
Grade (%)High (44% - 50%)
Lot NumberDebansy Engineering Mn Ore
Deviance0
Inward Quantity24.625
Freight8.44
Loading Charges-4
Offloading Charges0
Royalty3.99
Other Cost1
Quality Deviance0
Grade Deviance0
Total Cost1537.34
Conversion Rate (Please insert 1 if no conversion is required)1
Inward StatusAccepted

Raw Material Test

Showing 1-10 of 10 items.
Raw Material ComponentValue
Mn41.10
Fe1.50
SiO211.81
Al2O35.95
P0.16
Size 0-10MM7.50
Size 10-20MM3.96
Size 20-100MM10.94
Size +100MM77.60
MOISTURE2.15