Supply Date17 Feb 2021
Contract NumberSAFAL/P/MN ORE/01.05/2021
ItemManganese Ore
Supplier NameDebansy Engineering Ltd
Grade (%)High (44% - 50%)
Lot NumberDebansy Engineering Mn Ore
Deviance0
Inward Quantity33.625
Freight8.44
Loading Charges-4
Offloading Charges0
Royalty3.9
Other Cost1
Quality Deviance0
Grade Deviance0
Total Cost2096.18
Conversion Rate (Please insert 1 if no conversion is required)1
Inward StatusAccepted

Raw Material Test

Showing 1-9 of 9 items.
Raw Material ComponentValue
Mn40.79
Fe2.02
SiO211.15
Al2O37.38
P0.17
Size 0-10MM5.19
Size 10-20MM6.32
Size 20-100MM28.04
Size +100MM60.45