Supply Date14 Feb 2021
Contract NumberSAFAL/P/MN ORE/01.05/2021
ItemManganese Ore
Supplier NameDebansy Engineering Ltd
Grade (%)High (44% - 50%)
Lot NumberDebansy Engineering Mn Ore
Deviance0
Inward Quantity44.86
Freight5
Loading Charges0
Offloading Charges0
Royalty3.9
Other Cost1
Quality Deviance0
Grade Deviance0
Total Cost2821.69
Conversion Rate (Please insert 1 if no conversion is required)1
Inward StatusAccepted

Raw Material Test

Showing 1-9 of 9 items.
Raw Material ComponentValue
Mn40.02
Fe2.50
SiO212.50
Al2O35.90
P0.17
Size 0-10MM9.20
Size 10-20MM5.81
Size 20-100MM9.89
Size +100MM75.10