Supply Date13 Feb 2021
Contract NumberSAFAL/P/MN ORE/01.05/2021
ItemManganese Ore
Supplier NameDebansy Engineering Ltd
Grade (%)High (44% - 50%)
Lot NumberDebansy Engineering Mn Ore
Deviance0
Inward Quantity43.765
Freight5
Loading Charges0
Offloading Charges0
Royalty3.88
Other Cost1
Quality Deviance0
Grade Deviance0
Total Cost2751.94
Conversion Rate (Please insert 1 if no conversion is required)1
Inward StatusAccepted

Raw Material Test

Showing 1-9 of 9 items.
Raw Material ComponentValue
Mn40.10
Fe3.60
SiO212.10
Al2O36.92
P0.18
Size 0-10MM7.61
Size 10-20MM3.81
Size 20-100MM7.49
Size +100MM81.10