Supply Date11 Feb 2021
Contract NumberSAFAL/P/MN ORE/01.05/2021
ItemManganese Ore
Supplier NameDebansy Engineering Ltd
Grade (%)High (44% - 50%)
Lot NumberDebansy Engineering Mn Ore
Deviance0
Inward Quantity48.39
Freight5
Loading Charges0
Offloading Charges0
Royalty3.88
Other Cost1
Quality Deviance0
Grade Deviance0
Total Cost3042.76
Conversion Rate (Please insert 1 if no conversion is required)1
Inward StatusAccepted

Raw Material Test

Showing 1-9 of 9 items.
Raw Material ComponentValue
Mn40.15
Fe1.60
SiO212.50
Al2O37.10
P0.17
Size 0-10MM5.10
Size 10-20MM2.71
Size 20-100MM16.24
Size +100MM75.95