Supply Date07 Feb 2021
Contract NumberSAFAL/P/MN ORE/01.05/2021
ItemManganese Ore
Supplier NameDebansy Engineering Ltd
Grade (%)High (44% - 50%)
Lot NumberDebansy Engineering Mn Ore
Deviance0
Inward Quantity37.18
Freight8.44
Loading Charges-4
Offloading Charges0
Royalty3.14
Other Cost1
Quality Deviance0
Grade Deviance0
Total Cost2289.54
Conversion Rate (Please insert 1 if no conversion is required)1
Inward StatusAccepted

Raw Material Test

Showing 1-9 of 9 items.
Raw Material ComponentValue
Mn39.10
Fe1.95
SiO211.61
Al2O36.50
P0.17
Size 0-10MM7.10
Size 10-20MM5.10
Size 20-100MM52.30
Size +100MM35.50