Supply Date07 Feb 2021
Contract NumberSAFAL/P/MN ORE/01.05/2021
ItemManganese Ore
Supplier NameDebansy Engineering Ltd
Grade (%)High (44% - 50%)
Lot NumberDebansy Engineering Mn Ore
Deviance0
Inward Quantity45.895
Freight5
Loading Charges-18.55
Offloading Charges0
Royalty3.14
Other Cost1
Quality Deviance0
Grade Deviance0
Total Cost2000.56
Conversion Rate (Please insert 1 if no conversion is required)1
Inward StatusAccepted

Raw Material Test

Showing 1-9 of 9 items.
Raw Material ComponentValue
Mn30.10
Fe5.61
SiO214.90
Al2O37.95
P0.18
Size 0-10MM38.50
Size 10-20MM15.10
Size 20-100MM16.80
Size +100MM29.60