Supply Date06 Feb 2021
Contract NumberSAFAL/P/MN ORE/01.05/2021
ItemManganese Ore
Supplier NameDebansy Engineering Ltd
Grade (%)High (44% - 50%)
Lot NumberDebansy Engineering Mn Ore
Deviance0
Inward Quantity47.995
Freight5
Loading Charges0
Offloading Charges0
Royalty2.48
Other Cost1
Quality Deviance0
Grade Deviance0
Total Cost2950.73
Conversion Rate (Please insert 1 if no conversion is required)1
Inward StatusAccepted

Raw Material Test

Showing 1-9 of 9 items.
Raw Material ComponentValue
Mn36.61
Fe5.10
SiO214.10
Al2O37.66
P0.18
Size 0-10MM10.61
Size 10-20MM7.10
Size 20-100MM39.68
Size +100MM42.61