Supply Date06 Feb 2021
Contract NumberSAFAL/P/MN ORE/01.03/2021
ItemManganese Ore
Supplier NameRobbie Evans
Grade (%)High (44% - 50%)
Lot NumberRobbie Evans- Mn Ore
Deviance0
Inward Quantity39.205
Freight14.074
Loading Charges0
Offloading Charges0
Royalty0
Other Cost1
Quality Deviance0
Grade Deviance0
Total Cost2355.2
Conversion Rate (Please insert 1 if no conversion is required)1
Inward StatusAccepted

Raw Material Test

Showing 1-9 of 9 items.
Raw Material ComponentValue
Mn46.60
Fe7.90
SiO210.12
Al2O35.01
P0.12
Size 0-10MM3.10
Size 10-20MM2.50
Size 20-100MM58.90
Size +100MM35.50