Supply Date05 Feb 2021
Contract NumberSAFAL/P/MN ORE/01.05/2021
ItemManganese Ore
Supplier NameDebansy Engineering Ltd
Grade (%)High (44% - 50%)
Lot NumberDebansy Engineering Mn Ore
Deviance0
Inward Quantity48.15
Freight5
Loading Charges-18.55
Offloading Charges0
Royalty2.18
Other Cost1
Quality Deviance0
Grade Deviance0
Total Cost2052.63
Conversion Rate (Please insert 1 if no conversion is required)1
Inward StatusAccepted

Raw Material Test

Showing 1-9 of 9 items.
Raw Material ComponentValue
Mn23.10
Fe6.10
SiO218.91
Al2O310.70
P0.16
Size 0-10MM15.10
Size 10-20MM19.60
Size 20-100MM51.50
Size +100MM10.20