Supply Date05 Feb 2021
Contract NumberSAFAL/P/MN ORE/10.93/2020
ItemManganese Ore
Supplier NameKampoko Resources Ltd
Grade (%)Medium (38% - 44%)
Lot NumberKampoko Big Stone MG
Deviance0
Inward Quantity28.665
Freight8.44
Loading Charges0
Offloading Charges0
Royalty0
Other Cost1
Quality Deviance0
Grade Deviance0
Total Cost1445.86
Conversion Rate (Please insert 1 if no conversion is required)1
Inward StatusAccepted

Raw Material Test

Showing 1-9 of 9 items.
Raw Material ComponentValue
Mn38.20
Fe2.96
SiO212.50
Al2O36.67
P0.17
Size 0-10MM2.10
Size 10-20MM1.60
Size 20-100MM1.50
Size +100MM94.80