Supply Date04 Feb 2021
Contract NumberSAFAL/P/MN ORE/01.05/2021
ItemManganese Ore
Supplier NameDebansy Engineering Ltd
Grade (%)High (44% - 50%)
Lot NumberDebansy Engineering Mn Ore
Deviance0
Inward Quantity44.22
Freight5
Loading Charges0
Offloading Charges0
Royalty3.41
Other Cost1
Quality Deviance0
Grade Deviance0
Total Cost2759.77
Conversion Rate (Please insert 1 if no conversion is required)1
Inward StatusAccepted

Raw Material Test

Showing 1-9 of 9 items.
Raw Material ComponentValue
Mn36.90
Fe3.68
SiO214.08
Al2O38.15
P0.18
Size 0-10MM12.28
Size 10-20MM6.09
Size 20-100MM51.03
Size +100MM30.60