Supply Date03 Feb 2021
Contract NumberSAFAL/P/MN ORE/01.05/2021
ItemManganese Ore
Supplier NameDebansy Engineering Ltd
Grade (%)High (44% - 50%)
Lot NumberDebansy Engineering Mn Ore
Deviance0
Inward Quantity46.415
Freight5
Loading Charges0
Offloading Charges0
Royalty3.41
Other Cost1
Quality Deviance0
Grade Deviance0
Total Cost2896.76
Conversion Rate (Please insert 1 if no conversion is required)1
Inward StatusAccepted

Raw Material Test

Showing 1-9 of 9 items.
Raw Material ComponentValue
Mn37.10
Fe3.20
SiO212.50
Al2O36.24
P0.17
Size 0-10MM5.50
Size 10-20MM9.60
Size 20-100MM46.20
Size +100MM38.70