Supply Date03 Feb 2021
Contract NumberSAFAL/P/MN ORE/01.05/2021
ItemManganese Ore
Supplier NameDebansy Engineering Ltd
Grade (%)High (44% - 50%)
Lot NumberDebansy Engineering Mn Ore
Deviance0
Inward Quantity47.22
Freight5
Loading Charges0
Offloading Charges0
Royalty3.41
Other Cost1
Quality Deviance0
Grade Deviance0
Total Cost2947
Conversion Rate (Please insert 1 if no conversion is required)1
Inward StatusAccepted

Raw Material Test

Showing 1-9 of 9 items.
Raw Material ComponentValue
Mn38.60
Fe3.50
SiO211.81
Al2O37.75
P0.17
Size 0-10MM3.90
Size 10-20MM10.20
Size 20-100MM46.40
Size +100MM39.50