Supply Date02 Feb 2021
Contract NumberSAFAL/P/IRON ORE/01.10/2021
ItemIron Ore
Supplier NameIREEN MWANSA
Grade (%)N/A
Lot NumberIreen Mwansa - Iron Ore
Deviance0
Inward Quantity26.75
Freight320
Loading Charges0
Offloading Charges0
Royalty15
Other Cost0
Quality Deviance0
Grade Deviance0
Total Cost796.92
Conversion Rate (Please insert 1 if no conversion is required)21.315
Inward StatusAccepted

Raw Material Test

Showing 1-6 of 6 items.
Raw Material ComponentValue
Fe67.50
Mn0.59
SiO25.81
Al2O32.28
P0.13
Size 0-10MM10-200mm