Supply Date02 Feb 2021
Contract NumberSAFAL/P/IRON ORE/01.10/2021
ItemIron Ore
Supplier NameIREEN MWANSA
Grade (%)N/A
Lot NumberIreen Mwansa - Iron Ore
Deviance0
Inward Quantity27.66
Freight320
Loading Charges0
Offloading Charges0
Royalty15
Other Cost0
Quality Deviance0
Grade Deviance0
Total Cost824.03
Conversion Rate (Please insert 1 if no conversion is required)21.315
Inward StatusAccepted

Raw Material Test

Showing 1-6 of 6 items.
Raw Material ComponentValue
Fe66.70
Mn0.65
SiO26.12
Al2O32.15
P0.12
Size 0-10MM10-200mm