Supply Date31 Jan 2021
Contract NumberSAFAL/P/MN ORE/01.05/2021
ItemManganese Ore
Supplier NameDebansy Engineering Ltd
Grade (%)High (44% - 50%)
Lot NumberDebansy Engineering Mn Ore
Deviance0
Inward Quantity47.205
Freight0
Loading Charges0
Offloading Charges0
Royalty3.65
Other Cost6
Quality Deviance0
Grade Deviance0
Total Cost2957.39
Conversion Rate (Please insert 1 if no conversion is required)1
Inward StatusAccepted

Raw Material Test

Showing 1-9 of 9 items.
Raw Material ComponentValue
Mn39.25
Fe2.19
SiO213.02
Al2O37.60
P0.180
Size 0-10MM9.47
Size 10-20MM6.33
Size 20-100MM35.15
Size +100MM49.05