Supply Date29 Jan 2021
Contract NumberSAFAL/P/MN ORE/01.05/2021
ItemManganese Ore
Supplier NameDebansy Engineering Ltd
Grade (%)High (44% - 50%)
Lot NumberDebansy Engineering Mn Ore
Deviance0
Inward Quantity36.965
Freight8.54
Loading Charges0
Offloading Charges0
Royalty3.65
Other Cost-3
Quality Deviance0
Grade Deviance0
Total Cost2298.85
Conversion Rate (Please insert 1 if no conversion is required)1
Inward StatusAccepted

Raw Material Test

Showing 1-9 of 9 items.
Raw Material ComponentValue
Mn38.04
Fe3.70
SiO213.46
Al2O37.29
P0.17
Size 0-10MM11.16
Size 10-20MM4.32
Size 20-100MM38.94
Size +100MM45.58