Supply Date27 Jan 2021
Contract NumberSAFAL/P/MN ORE/12.111/2020
ItemManganese Ore
Supplier NameDebansy Engineering Ltd
Grade (%)High (44% - 50%)
Lot NumberDebansy Engineering Mn Ore
Deviance0
Inward Quantity44
Freight0
Loading Charges0
Offloading Charges0
Royalty3.65
Other Cost6
Quality Deviance0
Grade Deviance0
Total Cost2756.6
Conversion Rate (Please insert 1 if no conversion is required)1
Inward StatusAccepted

Raw Material Test

Showing 1-9 of 9 items.
Raw Material ComponentValue
Mn39.60
Fe1.81
SiO212.72
Al2O36.98
P0.18
Size 0-10MM5.62
Size 10-20MM10.15
Size 20-100MM4.43
Size +100MM79.80