Supply Date26 Jan 2021
Contract NumberSAFAL/P/MN ORE/10.93/2020
ItemManganese Ore
Supplier NameKampoko Resources Ltd
Grade (%)Medium (38% - 44%)
Lot NumberKampoko Big Stone MG
Deviance0
Inward Quantity25.42
Freight8.54
Loading Charges0
Offloading Charges0
Royalty0
Other Cost1
Quality Deviance0
Grade Deviance0
Total Cost1284.73
Conversion Rate (Please insert 1 if no conversion is required)1
Inward StatusAccepted

Raw Material Test

Showing 1-9 of 9 items.
Raw Material ComponentValue
Mn41.90
Fe1.10
SiO211.61
Al2O35.50
P0.17
Size 0-10MM1.10
Size 10-20MM1.20
Size 20-100MM17.50
Size +100MM80.20