Supply Date26 Jan 2021
Contract NumberSAFAL/P/MN ORE/10.94/2020
ItemManganese Ore
Supplier NameKampoko Resources Ltd
Grade (%)Medium (38% - 44%)
Lot NumberKampoko Mine MG Lumpy 2
Deviance0
Inward Quantity31.3
Freight8.54
Loading Charges0
Offloading Charges0
Royalty0
Other Cost1
Quality Deviance0
Grade Deviance0
Total Cost1644.5
Conversion Rate (Please insert 1 if no conversion is required)1
Inward StatusAccepted

Raw Material Test

Showing 1-9 of 9 items.
Raw Material ComponentValue
Mn35.50
Fe3.60
SiO215.10
Al2O36.12
P0.17
Size 0-10MM8.52
Size 10-20MM11.94
Size 20-100MM70.18
Size +100MM9.36