Supply Date26 Jan 2021
Contract NumberSAFAL/P/MN ORE/12.111/2020
ItemManganese Ore
Supplier NameDebansy Engineering Ltd
Grade (%)High (44% - 50%)
Lot NumberDebansy Engineering Mn Ore
Deviance0
Inward Quantity30.815
Freight8.54
Loading Charges0
Offloading Charges0
Royalty3.65
Other Cost-3
Quality Deviance0
Grade Deviance0
Total Cost1916.38
Conversion Rate (Please insert 1 if no conversion is required)1
Inward StatusAccepted

Raw Material Test

Showing 1-9 of 9 items.
Raw Material ComponentValue
Mn40.02
Fe1.60
SiO212.81
Al2O37.01
P0.17
Size 0-10MM10.15
Size 10-20MM6.32
Size 20-100MM43.01
Size +100MM40.52