Supply Date21 Jan 2021
Contract NumberSAFAL/P/MN ORE/12.111/2020
ItemManganese Ore
Supplier NameDebansy Engineering Ltd
Grade (%)High (44% - 50%)
Lot NumberDebansy Engineering Mn Ore
Deviance0
Inward Quantity36.58
Freight8.54
Loading Charges0
Offloading Charges0
Royalty3.65
Other Cost-3
Quality Deviance0
Grade Deviance0
Total Cost2274.91
Conversion Rate (Please insert 1 if no conversion is required)1
Inward StatusAccepted

Raw Material Test

Showing 1-9 of 9 items.
Raw Material ComponentValue
Mn40.10
Fe2.10
SiO211.12
Al2O36.24
P0.17
Size 0-10MM6.61
Size 10-20MM5.50
Size 20-100MM48.28
Size +100MM39.61