Supply Date15 Jan 2021
Contract NumberSAFAL/P/MN ORE/10.93/2020
ItemManganese Ore
Supplier NameKampoko Resources Ltd
Grade (%)Medium (38% - 44%)
Lot NumberKampoko Big Stone MG
Deviance0
Inward Quantity26.03
Freight8.54
Loading Charges0
Offloading Charges0
Royalty0
Other Cost1
Quality Deviance0
Grade Deviance0
Total Cost1315.56
Conversion Rate (Please insert 1 if no conversion is required)1
Inward StatusAccepted

Raw Material Test

Showing 1-9 of 9 items.
Raw Material ComponentValue
Mn39.04
Fe3.62
SiO213.02
Al2O36.19
P0.165
Size 0-10MM1.64
Size 10-20MM1.52
Size 20-100MM11.24
Size +100MM85.60