Supply Date15 Jan 2021
Contract NumberSAFAL/P/MN ORE/12.111/2020
ItemManganese Ore
Supplier NameDebansy Engineering Ltd
Grade (%)High (44% - 50%)
Lot NumberDebansy Engineering Mn Ore
Deviance0
Inward Quantity48.86
Freight0
Loading Charges0
Offloading Charges0
Royalty3.65
Other Cost1
Quality Deviance0
Grade Deviance0
Total Cost2816.78
Conversion Rate (Please insert 1 if no conversion is required)1
Inward StatusAccepted

Raw Material Test

Showing 1-9 of 9 items.
Raw Material ComponentValue
Mn36.27
Fe3.02
SiO214.16
Al2O36.72
P0.17
Size 0-10MM12.86
Size 10-20MM8.24
Size 20-100MM18.55
Size +100MM60.35