Supply Date14 Jan 2021
Contract NumberSAFAL/P/MN ORE/12.111/2020
ItemManganese Ore
Supplier NameDebansy Engineering Ltd
Grade (%)High (44% - 50%)
Lot NumberDebansy Engineering Mn Ore
Deviance0
Inward Quantity46.675
Freight0
Loading Charges0
Offloading Charges0
Royalty3.65
Other Cost6
Quality Deviance0
Grade Deviance0
Total Cost2924.19
Conversion Rate (Please insert 1 if no conversion is required)1
Inward StatusAccepted

Raw Material Test

Showing 1-9 of 9 items.
Raw Material ComponentValue
Mn37.18
Fe3.05
SiO213.64
Al2O36.90
P0.17
Size 0-10MM13.05
Size 10-20MM6.76
Size 20-100MM33.41
Size +100MM46.78