Supply Date12 Jan 2021
Contract NumberSAFAL/P/MN ORE/12.111/2020
ItemManganese Ore
Supplier NameDebansy Engineering Ltd
Grade (%)High (44% - 50%)
Lot NumberDebansy Engineering Mn Ore
Deviance0
Inward Quantity30.965
Freight8.54
Loading Charges-9
Offloading Charges0
Royalty3.65
Other Cost1
Quality Deviance0
Grade Deviance0
Total Cost1770.89
Conversion Rate (Please insert 1 if no conversion is required)1
Inward StatusAccepted

Raw Material Test

Showing 1-9 of 9 items.
Raw Material ComponentValue
Mn39.69
Fe3.40
SiO212.95
Al2O36.94
P0.17
Size 0-10MM5.77
Size 10-20MM7.18
Size 20-100MM42.35
Size +100MM44.70