| Furnace Name | Furnace I |
|---|---|
| Furnace Name | 17 Jan 26 |
| Time | 12:00:00 |
| TAP | 11 |
| KV | 11.33 |
| F/C Reading KWH | 279762.9 |
| F/C Reading KVAH | 333973.7 |
| F/C Consumption KWH | 4.7 |
| F/C Consumption KVAH | 5.4 |
| F/C Consumption PF | 0.87 |
| Primary Current E1 | 269 |
| Primary Current E2 | 270 |
| Primary Current E3 | 275 |
| SEC Voltage E1 | 26.7 |
| SEC Voltage E2 | 26.7 |
| SEC Voltage E3 | 26.7 |
| Holder Position E1 | 350 |
| Holder Position E2 | 350 |
| Holder Position E3 | 350 |
| Temp: A/T Oil | (not set) |
| Temp: A/T Winding | (not set) |
| Temp: F/T Oil | 44 |
| Temp: F/T Winding | 52 |