Supply Date07 Jan 2021
Contract NumberSAFAL/P/MN ORE/12.111/2020
ItemManganese Ore
Supplier NameDebansy Engineering Ltd
Grade (%)High (44% - 50%)
Lot NumberDebansy Engineering Mn Ore
Deviance0
Inward Quantity30.975
Freight8.54
Loading Charges-9
Offloading Charges0
Royalty3.65
Other Cost1
Quality Deviance0
Grade Deviance0
Total Cost1771.46
Conversion Rate (Please insert 1 if no conversion is required)1
Inward StatusAccepted

Raw Material Test

Showing 1-9 of 9 items.
Raw Material ComponentValue
Mn37.72
Fe3.65
SiO213.05
Al2O36.95
P0.17
Size 0-10MM4.29
Size 10-20MM4.79
Size 20-100MM30.62
Size +100MM60.30