Supply Date07 Jan 2021
Contract NumberSAFAL/P/MN ORE/12.111/2020
ItemManganese Ore
Supplier NameDebansy Engineering Ltd
Grade (%)High (44% - 50%)
Lot NumberDebansy Engineering Mn Ore
Deviance0
Inward Quantity28.795
Freight8.54
Loading Charges-9
Offloading Charges0
Royalty3.65
Other Cost1
Quality Deviance0
Grade Deviance0
Total Cost1646.79
Conversion Rate (Please insert 1 if no conversion is required)1
Inward StatusAccepted

Raw Material Test

Showing 1-9 of 9 items.
Raw Material ComponentValue
Mn37.18
Fe2.65
SiO212.72
Al2O37.15
P0.165
Size 0-10MM4.02
Size 10-20MM5.77
Size 20-100MM39.41
Size +100MM50.80