Supply Date05 Jan 2021
Contract NumberSAFAL/P/MN ORE/10.93/2020
ItemManganese Ore
Supplier NameKampoko Resources Ltd
Grade (%)Medium (38% - 44%)
Lot NumberKampoko Big Stone MG
Deviance0
Inward Quantity25.875
Freight8.54
Loading Charges0
Offloading Charges0
Royalty0
Other Cost1
Quality Deviance0
Grade Deviance0
Total Cost1307.72
Conversion Rate (Please insert 1 if no conversion is required)1
Inward StatusAccepted

Raw Material Test

Showing 1-9 of 9 items.
Raw Material ComponentValue
Mn36.25
Fe2.75
SiO213.75
Al2O37.80
P0.17
Size 0-10MM3.65
Size 10-20MM2.75
Size 20-100MM7.90
Size +100MM85.70