Supply Date05 Jan 2021
Contract NumberSAFAL/P/MN ORE/10.94/2020
ItemManganese Ore
Supplier NameKampoko Resources Ltd
Grade (%)Medium (38% - 44%)
Lot NumberKampoko Mine MG Lumpy 2
Deviance0
Inward Quantity32.6
Freight8.54
Loading Charges0
Offloading Charges0
Royalty0
Other Cost1
Quality Deviance0
Grade Deviance0
Total Cost1712.8
Conversion Rate (Please insert 1 if no conversion is required)1
Inward StatusAccepted

Raw Material Test

Showing 1-9 of 9 items.
Raw Material ComponentValue
Mn31.18
Fe5.05
SiO215.68
Al2O39.35
P0.18
Size 0-10MM5.25
Size 10-20MM7.90
Size 20-100MM86.85
Size +100MM-