Supply Date04 Jan 2021
Contract NumberSAFAL/P/MN ORE/12.111/2020
ItemManganese Ore
Supplier NameDebansy Engineering Ltd
Grade (%)High (44% - 50%)
Lot NumberDebansy Engineering Mn Ore
Deviance0
Inward Quantity46.35
Freight0
Loading Charges0
Offloading Charges0
Royalty3.65
Other Cost1
Quality Deviance0
Grade Deviance0
Total Cost2672.08
Conversion Rate (Please insert 1 if no conversion is required)1
Inward StatusAccepted

Raw Material Test

Showing 1-9 of 9 items.
Raw Material ComponentValue
Mn37.65
Fe2.90
SiO214.08
Al2O35.66
P0.17
Size 0-10MM6.28
Size 10-20MM3.90
Size 20-100MM40.05
Size +100MM49.77