Supply Date01 Jan 2021
Contract NumberSAFAL/P/MN ORE/12.111/2020
ItemManganese Ore
Supplier NameDebansy Engineering Ltd
Grade (%)High (44% - 50%)
Lot NumberDebansy Engineering Mn Ore
Deviance0
Inward Quantity28.09
Freight8.54
Loading Charges-9
Offloading Charges0
Royalty3.65
Other Cost1
Quality Deviance0
Grade Deviance0
Total Cost1606.47
Conversion Rate (Please insert 1 if no conversion is required)1
Inward StatusAccepted

Raw Material Test

Showing 1-9 of 9 items.
Raw Material ComponentValue
Mn36.10
Fe3.10
SiO212.20
Al2O36.70
P0.18
Size 0-10MM3.6
Size 10-20MM10.10
Size 20-100MM56.70
Size +100MM29.60