Supply Date30 Dec 2020
Contract NumberSAFAL/P/MN ORE/10.93/2020
ItemManganese Ore
Supplier NameKampoko Resources Ltd
Grade (%)Medium (38% - 44%)
Lot NumberKampoko Big Stone MG
Deviance0
Inward Quantity26.42
Freight8.616
Loading Charges0
Offloading Charges0
Royalty0
Other Cost2
Quality Deviance0
Grade Deviance0
Total Cost1363.69
Conversion Rate (Please insert 1 if no conversion is required)1
Inward StatusAccepted

Raw Material Test

Showing 1-9 of 9 items.
Raw Material ComponentValue
Mn42.10
Fe3.10
SiO212.12
Al2O36.92
P0.17
Size 0-10MM1.1
Size 10-20MM1.5
Size 20-100MM22.30
Size +100MM75.10