Supply Date29 Dec 2020
Contract NumberSAFAL/P/MN ORE/12.111/2020
ItemManganese Ore
Supplier NameDebansy Engineering Ltd
Grade (%)High (44% - 50%)
Lot NumberDebansy Engineering Mn Ore
Deviance0
Inward Quantity43.225
Freight8.616
Loading Charges0
Offloading Charges0
Royalty0
Other Cost0
Quality Deviance0
Grade Deviance0
Total Cost2663.35
Conversion Rate (Please insert 1 if no conversion is required)1
Inward StatusAccepted

Raw Material Test

Showing 1-9 of 9 items.
Raw Material ComponentValue
Mn38.66
Fe3.15
SiO213.44
Al2O37.05
P0.17
Size 0-10MM4.05
Size 10-20MM7.12
Size 20-100MM44.70
Size +100MM44.13