Supply Date27 Dec 2020
Contract NumberSAFAL/P/MN ORE/10.94/2020
ItemManganese Ore
Supplier NameKampoko Resources Ltd
Grade (%)Medium (38% - 44%)
Lot NumberKampoko Mine MG Lumpy 2
Deviance0
Inward Quantity34.21
Freight0
Loading Charges0
Offloading Charges0
Royalty0
Other Cost0
Quality Deviance0
Grade Deviance0
Total Cost1471.03
Conversion Rate (Please insert 1 if no conversion is required)1
Inward StatusAccepted

Raw Material Test

Showing 1-9 of 9 items.
Raw Material ComponentValue
Mn31.55
Fe4.95
SiO216.78
Al2O39.78
P0.17
Size 0-10MM5.35
Size 10-20MM12.35
Size 20-100MM79.06
Size +100MM3.24