Supply Date22 Dec 2020
Contract NumberSAFAL/P/MN ORE/12.111/2020
ItemManganese Ore
Supplier NameDebansy Engineering Ltd
Grade (%)High (44% - 50%)
Lot NumberDebansy Engineering Mn Ore
Deviance0
Inward Quantity40.1
Freight8.616
Loading Charges0
Offloading Charges0
Royalty0
Other Cost0
Quality Deviance0
Grade Deviance0
Total Cost2470.8
Conversion Rate (Please insert 1 if no conversion is required)1
Inward StatusAccepted

Raw Material Test

Showing 1-9 of 9 items.
Raw Material ComponentValue
Mn38.68
Fe3.17
SiO213.88
Al2O37.33
P0.17
Size 0-10MM5.27
Size 10-20MM5.95
Size 20-100MM38.98
Size +100MM49.80