Supply Date18 Dec 2020
Contract NumberSAFAL/P/MN ORE/12.111/2020
ItemManganese Ore
Supplier NameDebansy Engineering Ltd
Grade (%)High (44% - 50%)
Lot NumberDebansy Engineering Mn Ore
Deviance0
Inward Quantity34.045
Freight8.616
Loading Charges0
Offloading Charges0
Royalty0
Other Cost0
Quality Deviance(not set)
Grade Deviance(not set)
Total Cost2097.72
Conversion Rate (Please insert 1 if no conversion is required)1
Inward StatusAccepted

Raw Material Test

Showing 1-9 of 9 items.
Raw Material ComponentValue
Mn39.10
Fe4.10
SiO212.60
Al2O36.81
P0.17
Size 0-10MM3.10
Size 10-20MM2.5
Size 20-100MM24.25
Size +100MM70.15