Supply Date17 Dec 2020
Contract NumberSAFAL/P/MN ORE/12.111/2020
ItemManganese Ore
Supplier NameDebansy Engineering Ltd
Grade (%)High (44% - 50%)
Lot NumberDebansy Engineering Mn Ore
Deviance0
Inward Quantity29.145
Freight8.616
Loading Charges0
Offloading Charges0
Royalty3.4
Other Cost-7
Quality Deviance0
Grade Deviance0
Total Cost1690.88
Conversion Rate (Please insert 1 if no conversion is required)1
Inward StatusAccepted

Raw Material Test

Showing 1-9 of 9 items.
Raw Material ComponentValue
Mn38.50
Fe2.10
SiO212.10
Al2O36.62
P0.17
Size 0-10MM2.90
Size 10-20MM5.10
Size 20-100MM22.50
Size +100MM69.50