Supply Date14 Dec 2020
Contract NumberSAFAL/P/MN ORE/10.92/2020
ItemManganese Ore
Supplier NameDominic M Katongo
Grade (%)High (44% - 50%)
Lot NumberDominic Katongo- Mn Ore HG
Deviance0
Inward Quantity32.865
Freight290
Loading Charges0
Offloading Charges0
Royalty85.86
Other Cost41.782
Quality Deviance0
Grade Deviance0
Total Cost2387.5
Conversion Rate (Please insert 1 if no conversion is required)20.891
Inward StatusAccepted

Raw Material Test

Showing 1-9 of 9 items.
Raw Material ComponentValue
Mn43.12
Fe2.15
SiO216.88
Al2O33.75
P0.12
Size 0-10MM5.12
Size 10-20MM4.61
Size 20-100MM85.17
Size +100MM5.10